PRECISION BENCHMARKS
±0.003mm
Sub-micron resolution probe
Ra 0.2
Surface finish profilometry
100%
Thread gauge verification
QUALITY GATES
Four-step inspection protocol
01
02
03
04
Incoming stock check
First-article inspection
In-run SPC
Final CMM report
Spectrographic analysis verifies chemical composition and mill test reports before material release.
Initial parts undergo rigorous manual and automated CMM profiling against your exact CAD geometry.
Statistical process control monitors tool wear and dimensional drift during multi-axis machining.
Completed lots are packaged with complete dimensional sign-off records included prior to export.
Request inspection documentation
Submit your audit requirements or sample inspection reports directly to our Tainan engineering desk.
